BridgeSelect
🔋

Battery STC in Solar PV and Battery Upgrade jobs

A step-by-step guide from the BridgeSelect documentation.

← Back to FAQs

The Battery STC (Small-scale Technology Certificate) is part of the Federal Government’s expansion of the Renewable Energy Target. From 1 July 2025, eligible battery storage systems — either installed alongside new solar PV systems or as upgrades to existing systems — will be eligible to generate STCs, just like solar panels do today.

Reminder: To be eligible for the Battery STC rebate, batteries must not be commissioned before 1 July 2025. Please request your STC agents or the CER for further clarification on what is deemed commissioned.

⚡️ What’s Available Now in Bridge Select

1

Job creation for Battery Upgrade (only) and Solar PV + Battery (combo)

2

Battery STC enablement for eligible installations, including automatic STC calculation for rebates

3

Evidence capture to support compliance for battery installations (this will be refined as we know more about compliance requirements from the CER)

⚡️ What’s Coming Soon in Bridge Select

4

Mandatory declarations

5

Battery STC job listing and tracking

6

Battery STC pricing configuration

7

Additional documentary evidence requirements for key compliance stages

⚡️How It Works

8

Log in to your portal, open the sidebar menu, navigate to Jobs, click the Create button, and select Battery Upgrade OR Solar PV.

Screenshot
9

In the Customer Details tab, enter the owner and installation details, then click Save & Next.

Screenshot
10

You will be directed to the System Details tab. Under Connection and Battery Details, fill in the required fields including battery manufacturer and model, then click Add to register the battery.

Screenshot
11

After adding the battery, select the BSTC option to enable Battery STC eligibility. Once enabled, the system will automatically calculate the number of STCs that can be claimed.

Screenshot
12

Once all required fields are completed and STCs have been calculated, go to the Documents and Photos tab to upload all mandatory documents and installation photos.

Screenshot
13

For Solar PV + Battery jobs, STCs will continue to work alongside BSTCs as usual.

Screenshot
Reminder: Please ensure separate jobs are created for Solar PV and Battery Upgrades if you are completing a combo installation. This must be done before 1 July 2025.
14

For NSW jobs, PRCs will continue to work alongside BSTCs as usual.

Screenshot

For platform support, please contact your Bridge Select representative.

Still need a hand?

If you have any questions, please do not hesitate to reach out to us.

Contact the BridgeSelect Support Team